Sponsored Content

Sports Turf constructing stadium field, track at Seckinger

JULY 4

Sports Turf Company is constructing Seckinger High School’s artificial turf stadium field featuring a system that surpasses others in terms of safety, durability and performance. The Jaguars’ stadium is one of seven remaining Gwinnett County schools to receive renovations to their stadium before the 2022 season.

Football stadium and track at the new Seckinger High School in Gwinnett County. (Photo courtesy of Sports Turf)

The artificial turf system, which includes a 10-year warranty, features AstroTurf’s RootZone 3D3 Decade turf system, Brock SP Series shock pad, and the organic infill BrockFILL. AstroTurf’s RootZone 3D3 Decade is a performance artificial turf system that combines slit film and monofilament fibers with a RootZone layer of texturized fibers for optimum durability and better shock absorbency. The Brock shock pad technology is specifically engineered to optimize safety for athletes during impacts to the surface. The infill, BrockFILL, is a highly engineered wood particle infill specifically designed to improve traction and reduce artificial turf heat. BrockFILL is the latest in alternative infills and is sustainably grown and harvested in Georgia.

In addition, Sports Turf Company is constructing Seckinger High School’s running track around their artificial turf stadium field. The eight-lane running track will feature Rekortan B synthetic track surfacing. Rekortan B, the single-layer 13 millimeter paved-in-place track system, is a durable and economical solution for high schools.